Tampa Roof Replacement From Tear-Off to Final

Your roofer pulls the permit, strips the old roof to bare decking, replaces what's soft and builds the new roof to current Florida code.

Two roofers tearing off old shingles down to the decking, with debris sliding into a dumpster

Signs a Tampa roof is due for replacement

Most roof replacements in Tampa start one of two ways: the roof is showing its age, or the insurance company is asking about it. Either way, Roofing Services Tampa is the call for a full re-roof anywhere in Hillsborough County. We’ll get a licensed, insured roofer out for the whole job, from the tear-off to a new roof built to the Florida Building Code now in force.

Shingles don’t last as long here as the national charts suggest. Home inspectors’ Florida estimates put three-tab shingles at 10 to 12 years and architectural shingles at 15 to 20, and their chart notes that hot climates cut asphalt shingle life sharply. Tile lasts far longer, though the underlayment beneath it is what keeps the water out.

What shows from the yard:

  • Curling or splitting across whole slopes. NRCA treats both as deterioration, not a one-off repair.
  • Bare black patches where the granules are gone. IKO, a shingle maker, says granule loss becomes a problem once the asphalt underneath is exposed. A handful in the gutters is a different story; see granules in the gutters.
  • Leaks in a new spot every few months. That can point to worn-out underlayment rather than one bad flashing.

Your roofer adds what you can’t see from the ground: soft, spongy decking underfoot. Citizens’ roof inspection form lists soft decking alongside cracking, curling and granule loss as conditions the inspector records. If a letter from the insurer started all this, the roof certification letter page explains when an inspection can buy time instead of a new roof.

Curled, torn asphalt shingles with rusted nail heads showing above a gutter holding loose granules Curled, torn tabs like these, spread across a slope, point to a roof near the end of its life.

A re-roof, stage by stage

Stage What happens on the roof What you’ll notice at the house
Permit Your roofer applies for the re-roof permit; in unincorporated Hillsborough, that includes attesting the decking, underlayment and covering will meet code The permit card posted before work starts
Tear-off The old roofing and underlayment come off down to the decking A dumpster or trailer in the driveway, steady pounding, debris coming down past the windows
Deck check The bare deck gets walked, soft or rotted sheets cut out, and nails added where the code calls for them Fresh plywood patches where bad sheets came out
Dry-in Sealed-deck underlayment goes on so the house is watertight before the finish roofing The roof wrapped in underlayment; the dry-in or progress inspection happens about now
Roof covering Drip edge, flashing, vents and the shingles, tile or metal go on The finished roof, with its edges, vents and flashing
Final Final inspection, cleanup and a magnet sweep of the yard for nails One last inspection, done virtually inside the City of Tampa

Between tear-off and dry-in, the house has the least protection it will have all job. Ask on the call how much roof gets opened each day and how it’s covered if an afternoon storm builds.

Tear-off shovel lifting old shingles off plywood decking that has a dark, rotted patch Tear-off takes the roof down to the decking, which is when soft or rotted sheets show up.

Code upgrades a roof replacement brings to older houses

Every re-roof gets the current code for underlayment. Older houses get more, and those extra lines on the written price are code, not upsells.

Applies to What the code adds What it protects against
Every shingle re-roof A sealed roof deck: a full self-adhered membrane, self-adhered tape over the deck seams under the underlayment, or two layers lapped and fastened to a set pattern Water pouring in through deck seams if wind strips the shingles off
Tile re-roofs Underlayment and fastening done to the FRSA-TRI high-wind tile manual Leaks once wind-driven rain gets under the tile
Houses permitted before the Florida Building Code Extra 8d ring-shank nails 6 inches apart wherever the deck was stapled, nailed with 6d nails, or nailed with 8d nails spaced wider than 6 inches, plus a secondary water barrier Decking peeling off in high wind
Pre-FBC houses in the wind-borne debris region insured for $300,000 or more Stronger roof-to-wall connections where the rafters or trusses meet the walls, with the required retrofit capped at 15% of the re-roof cost The whole roof lifting off the walls

The original permit decides whether a house was built under the Florida Building Code, and the address’s design wind speed decides whether it sits in the wind-borne debris region. Your roofer works both out from the permit and the county’s wind maps. If the house went up in the 1980s or 1990s, expect the deck re-nailing and the secondary water barrier on the price.

Since 2025, Florida law lets the roofing contractor do the roof-to-wall work as part of the re-roof, so your roofer can handle the straps along with everything else.

Galvanized hurricane strap tying a wooden roof truss to a block wall, seen in an attic by flashlight Straps like these tie the trusses to the walls, and your roofer can handle them as part of the re-roof.

Permit inspections on a Tampa re-roof

The building department wants to see the roof’s attachment before it disappears under shingles or tile, then the finished roof. Your roofer books both.

In unincorporated Hillsborough County, that first look is a progress check, in person or virtual with photos or video, confirming the roof attachment was strengthened to code. A Roof Mitigation Verification Statement can be uploaded in its place. A final roof inspection closes the permit.

Inside the City of Tampa, tile roofs and homeowner permits get a dry-in inspection, while on other roofs a mitigation statement or attestation can stand in for it. Then comes the final, and the city does residential roofing inspections virtually. Temple Terrace, Plant City and the Polk County side run their own offices; roof permits covers who issues what. Once the final passes and shows on the permit record, the roof is done.

After the final, the wind mitigation form

A new roof changes several things the wind mitigation form records: the roof covering and its permit date, how the deck is fastened, the roof-to-wall connections and the secondary water barrier. Insurers use that form to set wind discounts, and an old one describes the old roof. It takes a signature from someone on Florida’s list, which doesn’t include a roofing license on its own; roof inspection types covers who signs it.

Same roof again, or something different?

A like-for-like re-roof, shingles for shingles or tile for tile, is the simplest version of this job. Switching changes the details. Tile is far heavier than shingles and the framing has to carry it, and metal near the bay comes with warranty limits. Those conversions are covered under roof installation, and metal vs shingles compares the two for a Tampa house.

What happens when you call

From your call to a finished roof

A leak, storm damage or a roof that’s due: tell Roofing Services Tampa what’s going on anywhere in Hillsborough County and nearby Polk County, and we’ll stay with you from the first call until the job is done.

  1. Call and tell us what’s going on

    A drip over the bedroom, shingles in the yard, a letter from the insurer: tell us what the roof is doing and where the house is.

  2. We get a licensed roofer out

    A licensed, insured roofer who works your part of the county looks at the roof, or calls back first to set a time.

  3. You see a written price

    You’ll have the price in writing before any work starts, and you only pay for work you agreed to.

  4. Your roof gets fixed

    The leak stops, the storm damage gets put right, or the new roof goes on. Then it’s done.

Questions about replacing a roof

Can new shingles go over the old roof instead of a tear-off?

Sometimes, but it's the exception. Florida's existing-building code bars a re-cover when the old roof is water-soaked or deteriorated, and over clay or concrete tile. A tear-off is also the only way to see the decking, and on an older house the extra deck nailing and secondary water barrier go onto a bare deck. Most re-roofs here start with a full tear-off.

What happens if rotten decking turns up?

The soft sheets get cut out and replaced with new plywood before the underlayment goes down. Your written price states the per-sheet charge and how many sheets, if any, the base price covers, so there's no guessing once the old roof is off. Ask for photos of the damaged decking before it's covered.

Can we stay in the house during the re-roof?

Yes, but it's loud. Expect pounding overhead all day during the tear-off, and dust and bits of old roofing dropping into the attic. Move the cars out of the driveway, take pictures off the walls upstairs and cover anything stored in the attic. Keep kids and pets away from the edges of the house, where debris and loose nails land.

Does a new roof reset the roof's age for my insurer?

Yes, a full replacement does. Florida law measures roof age from the last date 100% of the roof surface was built or replaced, so a complete re-roof starts that clock over. A partial one doesn't, unless later partial jobs finish the rest of the roof. Keep the final inspection record and the permit number, since insurers ask for the permit date.