New Roof Installation in Tampa and Hillsborough

Tell us what you're building while the framing is still open. Your roofer plans the system and its edges so the wind protection goes in from the first sheet.

Two installers fastening light gray standing seam metal panels over black underlayment

Installation or replacement: which job is yours?

Roof installation means putting a roof on something that doesn’t have one yet, or changing what the roof is made of. A new house, a room addition, a lanai or porch roof, a detached garage, and a shingle roof coming off so metal or tile can go on all count. For a new roof anywhere in Tampa or Hillsborough County, call Roofing Services Tampa and we’ll get a licensed, insured roofer out to talk through the system with you before anything is ordered.

Tearing off a worn roof and putting the same kind back is a roof replacement, and that page walks through the tear-off, deck repairs and re-roof inspections. An installation front-loads the decisions instead. The fasteners, the underlayment and the edge details go in once, and changing them later means taking the roof back off.

Where a new roof meets an old one

On an addition, the tie-in is the line where the new roof meets the existing roof or the side of the house. It comes in three versions, and each one leaks in its own way.

New roof against an existing wall. Step flashing goes in at every shingle course, with counter-flashing or a cover over it, and the stucco or siding finished down over the top. If the flashing is caulked to the face of the stucco instead of tucked behind it, that bead of caulk is all that keeps water out.

New roof meeting the old roof. Where two slopes meet, a valley forms. The old shingles along it get cut back or woven in, and the underlayment has to lap from the old roof onto the new one so water runs over the seam, not into it.

A low porch roof under a higher eave. Everything the main roof sheds pours onto the porch roof in one strip. A gutter or diverter above it, and the porch roofing turned up the wall behind flashing, keep that strip from becoming the leak.

Your written price should describe the tie-in, in words or a sketch. If the existing roof is near the end of its life, ask about re-roofing the slope that meets the addition at the same time, so the new work isn’t flashed into shingles that will come off in a few years.

New metal step flashing woven into charcoal shingles where a roof meets a stucco wall Step flashing worked in course by course, the way a new roof should meet an existing wall.

How flat can a porch or lanai roof be?

Shingles and tile need pitch to shed water. A porch, carport or lanai roof that’s close to flat needs a low-slope system instead: a membrane such as modified bitumen or TPO. Even those need some fall: Florida’s code sets a minimum design slope of a quarter inch per foot for modified bitumen. Water that sits for days on a membrane points to a slope or framing problem, not bad weather.

The edge is the other weak point. When IBHS surveyed southwest Florida after Hurricane Ian, low-slope roofs had damage rates above 50%, mostly where the edge flashing or coping let go. Those were commercial buildings, but a porch roof has the same detail, so the gauge of the edge metal and how it’s fastened belong on the written price.

A coating’s warranty depends on how thick it goes on. One silicone coating maker’s coverage guide, for example, calls for 20 dry mils over TPO for a 5-year warranty and 30 dry mils for a 15-year one, so a coating price should state the thickness going on, not only the brand.

White coating on a flat roof cracked all over and peeling, with pipes and an AC unit on the roof A liquid coating that goes on too thin cracks and peels like this, which is why the quote should state the thickness.

Switching systems: shingles to metal or tile

Metal

Metal goes over a properly underlaid deck like any other roof, but near the water the metal itself matters. One manufacturer’s Galvalume warranty excludes homes inside set distances from a large bay or canal, and other makers set their own limits. Metal vs shingles covers those distances and how the two hold up to Tampa wind and heat. If an HOA has a say on the panel and color, mention it when you call so approval comes before anything is ordered.

Tile

Tile is heavy, and framing sized for shingles may need an engineer’s review, and sometimes added framing, before it can carry tile. Why heavy tile can make a roof sag explains what goes wrong when that step gets skipped.

Florida tile goes on following the FRSA-TRI high-wind installation manual that the building code references. Because the manual cautions against combining attachment systems on one roof, the attachment method your roofer will use goes in writing on the price.

Roofer setting flat concrete tiles onto dabs of foam adhesive over new underlayment Foam adhesive is one way to attach tile, so get the method the roofer will use written on the quote.

Product approval numbers on the price

Roofing products used on Florida homes need Florida product approval, or a local approval such as a Miami-Dade Notice of Acceptance, before they go on a permitted roof. Your written price lists the approval number for the roof covering and for the underlayment.

Keep those numbers with the permit papers. The wind mitigation form asks for the roof covering’s product approval number or permit date, and the inspector will want it.

Sealed roof deck and FORTIFIED: what to build in

Current Florida code already requires a sealed roof deck under shingles on every new roof here. That’s the minimum. The FORTIFIED Roof standard goes further, and it’s cheapest to meet on a bare new deck:

  • A sealed roof deck, as the code requires
  • 8d ring-shank deck nails in a tighter pattern, which FORTIFIED says nearly doubles the deck’s hold against wind
  • A wider drip edge and a fully adhered starter strip along the edges
  • Attic vents rated to resist wind and rain
  • An optional hail supplement using shingles rated Good or Excellent in IBHS’s impact-resistant shingle ratings, meant to stand up to hail up to 2 inches

FORTIFIED comes in three levels: Roof, Silver and Gold. The designation needs a certified FORTIFIED evaluator to verify the work, so say on the call that you want it, before the roof goes on. The wind mitigation form that took effect in April 2026 now accepts a FORTIFIED Roof, Silver or Gold certificate as documentation for several roof items, and insurers set their own credits for it.

Building new: wind speed, code edition and permit

The roof’s design wind speed comes from the address, and Hillsborough County’s wind maps put lines at 130, 140 and 150 mph. The framing plans, the covering’s wind rating and the nailing pattern all follow from that number.

The code edition matters this year. The 8th Edition (2023) Florida Building Code is in force, and the 9th Edition takes effect December 31, 2026; permit applications submitted on or after that date must meet it. Plans for a house or an addition drawn this fall should be drawn to the edition the permit will fall under.

A new porch or addition roof means new framing, and Florida’s $7,500 small-job permit exemption excludes structural work, so plan on a permit and inspections; your roofer pulls the permit. Roof permits shows which office handles your address. Installations are priced by area and pitch like any other roof, and the roof replacement cost guide shows how squares and pitch move the number.

What happens when you call

From your call to a finished roof

A leak, storm damage or a roof that’s due: tell Roofing Services Tampa what’s going on anywhere in Hillsborough County and nearby Polk County, and we’ll stay with you from the first call until the job is done.

  1. Call and tell us what’s going on

    A drip over the bedroom, shingles in the yard, a letter from the insurer: tell us what the roof is doing and where the house is.

  2. We get a licensed roofer out

    A licensed, insured roofer who works your part of the county looks at the roof, or calls back first to set a time.

  3. You see a written price

    You’ll have the price in writing before any work starts, and you only pay for work you agreed to.

  4. Your roof gets fixed

    The leak stops, the storm damage gets put right, or the new roof goes on. Then it’s done.

Questions about new roof installs

How much does a new roof installation cost in Tampa?

It's priced the same way a replacement is, minus the tear-off: the roof's area in squares, its pitch and shape, the material, the underlayment method and any extras such as the FORTIFIED items. An addition or porch roof adds the tie-in and the flashing against the house. Your written price lists each of those as its own line.

How long does a new roof installation take?

The days on the roof are only one piece of it. On a new house or an addition, the schedule follows the framing, the decking and the inspections the permit calls for, so tell us early where the build stands. Switching an existing house to tile can add an engineer's review of the framing before any tile is ordered.

Should the roof on my addition match the main house?

Match the system, and the color as closely as you can. A different material on a small addition can work, but the tie-in has to be detailed for both. Older shingles fade, so ask for a sample held against the existing roof before ordering. If the main roof is close to replacement age, get a price for doing both at once.

Is a FORTIFIED roof worth the extra cost?

It depends on the credit your insurer gives and how long you'll own the house. The extra nailing and edge work cost least on a new deck, because nothing has to come off first. Your written price can show the FORTIFIED items as their own line, so you can see exactly what they add.